Composting Facilities
Blaise Farm
This purpose built 50,000 tonne per year facility has been operating since 2008. It is set within a quarry just outside of the town of West Malling. It enjoys excellent access to the primary road network and serves a number of local authorities within the surrounding region.
These composting facilities are large scale composting
facilities comprising of waste reception, composting, screening,
pasteurisation and maturation halls. The structures are multibay
steel portal frames on reinforced concrete foundations supported
on piles with reinforced concrete power floated piled ground
floor slabs. The waste reception buildings receive incoming
waste for initial sorting/processing prior to distribution to
the main processing area of the building. The composting halls
are the primary facility for processing the waste.
Back to /Projects /Industrial Projects